Planning Forms

2022 Zoning and Development Schedule

Schedule of fees

Electronic Submittal & Digital Submission Guidelines

Residential Development Summary

Non-Residential and Multifamily Development Summary

  1. Pre-application
    1. Application
    2. Information
  2. Annexation
    1. Annexation Summary
    2. Annexation Petition
    3. Letter of Intent
    4. Annexation Checklist
    5. Tax Certification Request
  3. Zoning
    1. Zoning Summary
    2. Zoning Change Application
    3. Letter of Intent
    4. Zoning Change Request Checklist
    5. Zoning Change Signage Information
    6. Sample Letter to Request Tabling
    7. Tax Certification Request
  4. Planned Development Zoning Request
    1. Zoning Summary
    2. Zoning Change Application
    3. Letter of Intent
    4. Planned Development Checklist
    5. Development Standards Template Exhibit C
    6. Zoning Change Signage Information
    7. Sample Letter to Request Tabling
    8. Tax Certification Request
  5. Future Land Use Plan Amendment
    1. Future Land Use Plan Amendment Application
    2. Letter of Intent
    3. Future Land Use Plan Amendment Checklist
    4. Tax Certification Request
  6. Specific Use Permit
    1. Zoning Summary
    2. Zoning Change Application
    3. Letter of Intent
    4. Specific Use Permit Checklist
    5. Zoning Change Signage Information
    6. Sample Letter to Request Tabling
    7. Tax Certification Request
  7. Preliminary Site Plan
    1. Development Application
    2. Letter of Intent
    3. Preliminary Site Plan Checklist
    4. Tax Certification Request
  8. Site Plan
    1. Development Application
    2. Letter of Intent
    3. Site Plan Checklist
    4. Tax Certification Request
  9. Façade Plan (Required with the site plan submittal)
    1. Façade Plan Checklist
    2. Sample Board
  10. Open Space Plan (Required with the site plan submittal)
    1. Open Space Plan Checklist
  11. Civil Plans (Required with the site plan submittal)
    1. Civil Engineering Checklist (Non-residential)
    2. Civil Engineering Checklist (Residential)
  12. Landscape Plan (Required with the Civil Engineering Plans)
    1. Landscape Plan Checklist
    2. General Tree Survey Checklist
    3. Detailed Tree Survey Checklist
    4. Irrigation Plan Checklist
  13. Plat
    1. Development Application
    2. Letter of Intent
    3. Final Plat (required with the site plan submittal), Replat, and Amending Plat Checklist
    4. Conveyance Plat Checklist
    5. Preliminary Plat Checklist
    6. Plat Language
    7. Easement Language
    8. Sample of Letter for Waiver (for 30 Day Action on a plat)
    9. Tax Certification Request
  14. Variance
    1. Variance Application
    2. Letter of Intent
    3. Variance Checklist
  15. Signs
    1. Special Purpose Sign District Application
    2. Letter of Intent
    3. Special Purpose Sign District Checklist
  16. Downtown
    1. NEZ/DRRP Application
    2. Letter of Intent
    3. Checklist
  17. Network Nodes
    1. Network Node Design Manual
    2. Network Node Information Sheet